| Project | Requirements for Parameters | |
| Installation Site | First Mine Yangpo Weir | |
| Installation Date | 2014.8 | |
| Operation Time | 21 months | |
| Rated Voltage | 35/6.3kV | |
| Number of High-voltage Phases | Three-phase | |
| Number of Low-voltage Phases | Three-phase | |
| Rated Capacity kVA | 2000 | |
| High-voltage Tapping Scope % | ±2×2.5 | |
| Rated Current A | 33/183.3 | |
| Rated Frequency Hz | 50 | |
| Coupling Group | Yd11 | |
| No-load Loss W | 4230 | |
| Load Loss W | Level F(120℃) | 18200 |
| Total Loss W | Level F(120℃) | 22430 |
| No-load Current % | 0.75 | |
| Short-circuit Impedance % | 7.2 | |
| Noise Level dB | 55 | |
| Cooling Mode | ANAF | |
| Voltage Regulating Mode | No excitation voltage adjustment | |